Cookie Preferences

We use cookies to enhance your experience, analyze site traffic, and personalize content. You can choose which cookies to accept.

View our Privacy Policy

📖 Browse Our Complete Product Catalog

Amazon FC LBA2 — Contractor Control & Safety Signage

manufacturingothermixed

Amazon FC LBA2 — Contractor Control & Safety Signage

Doncaster, South Yorkshire, UK
September 2026
Budget: 5k - £15k
Amazon FC LBA2 — Contractor Control & Safety Signage

Project Video

Project Overview

A complete rebrand of the Amazon Fulfilment Centre LBA2 reception and Contractor Control station. Howcroft Signs designed, manufactured and installed a full vinyl wall and desk wrap programme that transformed a plain yellow-fronted reception into a fully branded, safety-led environment — covering the rear wall, the curved three-section reception desk, and the adjacent entry / no-entry doors and floor zone.

Client Goals & Challenges

The existing reception was a plain white wall with a single paper chart and a curved desk with mustard-yellow front panels — unbranded and inconsistent with Amazon's FC LBA2 operational standards. The works had to deliver a cohesive Contractor Control identity, integrate mandatory Fire, Life & Safety messaging (FLS / KEEP CLEAR), and add clear entry / no-entry wayfinding, all within a live, 24/7 operational facility with zero tolerance for downtime or safety compromise.

Our Solution

Howcroft manufactured and installed a comprehensive vinyl signage package: a dark navy wall wrap with technical blueprint-style line art and large-scale 'FC LBA2 / Contractor Control' branding; a dedicated red FLS (Fire, Life, Safety) zone framed with diagonal hazard striping and 'KEEP CLEAR AT ALL TIMES' messaging; a full curved-desk wrap featuring the Amazon wordmark, a gear motif, and a 'SAFETY IS OUR PRIORITY' panel with SEE IT, LOTO and SPEAK UP safety icons; plus green-arrow ENTRY and red NO ENTRY door signage with yellow door-swing floor decals. All graphics were produced in-house and applied with minimal disruption to site operations.

Results & Impact

The reception was transformed into a fully branded Contractor Control station that reinforces Amazon's safety culture from the moment contractors arrive. Mandatory FLS and keep-clear messaging is now highly visible, entry and exit routes are unambiguous, and the space aligns with FC LBA2's corporate identity — delivered on time with no operational downtime.

40m²
Wall area wrapped
12+
Safety messages installed
2 days
Install time

Key Details

Dimensions

Full reception wall wrap (~6m wide) + curved 3-section desk wrap + twin-door wayfinding vinyl

Budget Range

5k-15k

Material

mixed

Completion Date

16 September 2026

Inspired by This Project?

Let's create something amazing for your business

Ready to Start Your Project?

Our team of experts is ready to help bring your signage vision to life

Frequently Asked Questions

Everything you need to know about our signage installation process