Cookie Preferences

We use cookies to enhance your experience, analyze site traffic, and personalize content. You can choose which cookies to accept.

View our Privacy Policy

📖 Browse Our Complete Product Catalog

Amazon MAN2 — RME Excellence Area & Automation Engineering Team Partition Branding

manufacturingothermixed

Amazon MAN2 — RME Excellence Area & Automation Engineering Team Partition Branding

MAN2 Fulfilment Centre
October 2026
wall graphics for Amazon (MAN2 Fulfilment Centre)Zoom

Project Overview

A freestanding partition branding scheme for Amazon MAN2's RME (Reliability, Maintenance & Engineering) team. The screens that divide the engineering bays are wrapped in a navy technical environment graphic - light blue gear and network-node linework with a sweeping orange arc - carrying the MAN2 fulfillment centre wolf emblem and "RME Excellence Area" and "Automation Engineering Team" lettering. Each partition is finished with a chequer-plate kick plate, carries the tooling it supports (motor winding, TBS alignment and pulley alignment tool holders) and hosts a six-panel condition-monitoring poster set covering ultrasound, Monitron, oil analysis, air leak detection, stroboscope and thermography, alongside a Lubrication "why machines fail" fault-finding infographic. The zone boundary is marked on the floor with a large die-cut wolf head decal.

Client Goals & Challenges

Branding had to work around an operational engineering bay that could not be taken out of use: structural columns, the workbench, lubricant equipment and the COSHH area all sit within the partition run, and the technical content has to stay legible against a busy gear and node pattern.

Our Solution

The graphics were set out around the existing bench, equipment and column positions so panels butt-joined cleanly and every fixing cleared the services behind. Poster sets were designed on their own high-contrast panels and positioned at reading height rather than over the decorative artwork, and the chequer-plate kick plate was carried across the base of each screen for protection in a working engineering zone.

Results & Impact

The RME team now has a defined, branded excellence area: tooling is stored and identified in place, condition-monitoring and lubrication guidance sits permanently beside the bay, and the partition reads as part of Amazon's site identity rather than temporary screening.

Key Details

Material

mixed

Completion Date

26 October 2026

Inspired by This Project?

Let's create something amazing for your business

Ready to Start Your Project?

Our team of experts is ready to help bring your signage vision to life

Frequently Asked Questions

Everything you need to know about our signage installation process